Certificates of completion for finish applications and furniture installations Answer: B At what stage would you conduct a building analysis for an existing multistory structure that is to be renovated and converted from office use to school use?ĭ. Record documents for finish applications and furniture installationsĭ. Guarantees or warranties for furnishings and finishesĬ. Maintenance manuals for furnishings and finishesī. Answer: D At project closeout, what documentation MUST contain the certification of flameproofing for finishes?Ī. dominant inside finished surface of the exterior wall to the inside of the opposite interior partition. dominant inside finished surface of the exterior wall to the centerline of the opposite interior partition.ĭ. center of the exterior wall to the inside of the opposite interior partition.Ĭ. outside of the exterior wall to the centerline of the opposite interior partition.ī. TERMS IN THIS SET (44) According to BOMA standards, net area is measured for a tenant suite from the:Ī.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |